Brownfield expansion: a gas compressor installed at an existing, operating sour gas processing plant.
72 t
Key figure
Central Alberta
Location
Midstream operator
Client
Brownfield expansion at an existing, operating sour gas processing plant in Central Alberta: a 72-tonne, 1,120 kW (1,500 hp) reciprocating compressor package was lifted over a sour gas pipe rack and set on its permanent foundation.
Access and reach limitations required two 272-tonne-capacity mobile cranes for the lift.